Items that are to be completed this spring:
Wall repair - Finance Committee has approved funding to replace shingles and wiring to bring the cemetery wall back to code.
Church sign - Funds for replacing the church sign at RT 401 and St. Andrews Lane have been approved as well. It will be 26 square feet, so much larger than the current sign. Will be using the same design just going to 64 inches wide by 59 inches tall. There will be message lines at the bottom as well.
There has been a donation given for plantings around the sign as well.
Spring Cleanup is the next big project. It will be on Saturday, April 23rd from 9am-noon. Volunteers are needed and signup opportunities will be posted everywhere.
There is a lot of stucco work and painting that needs to be done and waiting for the weather and scheduling to allow for this to happen.
I plan on painting the rest of the cemetery wall (and hopefully the street facing) side of the church itself this spring. As many know, we were the victim of at least 2 egg attacks that is very hard to remove.
As always, if there are any issues or you see something that needs attention, please reach out to me directly.
God Bless,
John Strang
jestrangjr@gmail.com
215-275-3891
Comments